Where Any Facility Begins

The construction, reconstruction, or development of any facility begins with obtaining electrical capacity.

It is the connection to the electrical grid that determines a facility's permissible parameters, scale, functionality, and further development.


The connection process is governed by current Ukrainian legislation and requires strict compliance with established procedures and deadlines.

connection stages

Order a service

1 /Obtaining technical conditions

The starting point of any project is obtaining technical conditions (ТУ) and and drawing up the technical specification for design from the distribution system operator (ОСР), such as:

  • DTEK
  • JSC Ukrzaliznytsia
  • CEK
  • other distribution system operators

Technical conditions define:

  • permitted capacity
  • connection point
  • requirements for power supply schemes
  • conditions for redundancy and electricity metering

2 /Design and approval

To start construction and installation work, it is necessary to:

  • develop a power supply project for the facility
  • agree the design documentation with the distribution system operator
  • if necessary, carry out land allocation procedures for placing DSO grid facilities

An approved project is a mandatory condition for further implementation of the facility.

3 /Implementation and Commissioning

After construction and installation work is complete, it is necessary to:

  • confirm that the technical conditions have been met
  • obtain a certificate confirming compliance with the ТУ
  • commission the facility in the established manner

An approved project is a mandatory condition for further implementation of the facility.

4 /Contractual relations

After the facility is commissioned, the following are concluded:

  • electricity distribution agreements with the DSO
  • electricity supply agreements with the chosen supplier.

Special provisions Under Martial Law

NEURC (НКРЕКП) Resolution No. 352 of 26.03.2022, “On Simplifying Procedures for Connection to Electrical Grids During Martial Law”.

Alternative Energy and Generation

Alternative energy and generation facilities are subject to additional procedures:

obtaining a license from the NEURC (if necessary)

obtaining and confirming the feed-in tariff

concluding agreements:

  • 1 / for generation under the model «Active Consumer»
  • 2 / for generation under the model «Producer»
  • 3 / з NEC Ukrenergo
  • 4 / з SE “Guaranteed Buyer”
logo

our approach

Our company can act officially on the Customer's behalf under a power of attorney and and support the connection process at every stage:

  • interaction with distribution system operators;
  • preparation and submission of the required documentation;
  • coordination of design, approvals, and implementation;
  • support in concluding agreements;
  • optimization of timelines and technical solutions based on real conditions.

We provide a systematic, lawful and technically sound approach to connecting facilities to electrical grids.